The funding application states that WACKER wants to build a 20-megawatt electrolysis plant with Linde GmbH to generate hydrogen from water using renewable electricity. Further, the project includes a synthesis plant for processing the green hydrogen into renewable methanol, using carbon dioxide from existing production processes. The synthesis plant’s expected capacity is 15,000 metric tons per year.
No comments:
Post a Comment