The site lies adjacent to the Geraldton Port and the proposed US$1.8 billion Project Haber development will include a 800,000-tonne ammonia production train, 300,000 tonnes of onsite urea storage, power and utilities, steam generation, rail sidings for transport and a 120-kilometre raw gas pipeline from the Perth basin.
No comments:
Post a Comment