Around two thirds of this transport system will be formed through the conversion of the existing natural gas infrastructure and a third through the addition of new H2 pipelines. This will produce an initial grid totaling 475 kilometers in length and interconnecting the production and consumption points in Mecklenburg- Western Pomerania, Brandenburg, Saxony, Saxony-Anhalt and Berlin.
No comments:
Post a Comment